|
|
Nov 24, 2024
|
|
AIR 278 - HVAC System Startup and Commissioning (3 CR) Offered Spring Semester
Presents the process for ensuring that a Heating, Ventilation, and Air Conditioning (HVAC) system meets operational requirements and that it provides acceptable indoor air quality. Covers different levels of commissioning from basic to the actual re-commissioning evaluation. Includes functional performance testing, operator training, Material Safety Data Sheet (MSDS) forms, and equipment data sheets as well as operational and maintenance manuals. Lecture 2 hours. Laboratory 2 hours. Total 4 hours per week.
Add to Portfolio (opens a new window)
|
|
|